Tool

Cost model

This replaces the invented CAPEX figures in our early research notes (see the cost model lesson). Instead of one "true" number, it produces a range from bank parameters you enter and assumptions you can edit. Every output is ESTIMATED, because that is what it is.

Bank parameters
Assumptions (ESTIMATED, edit)

Cost range, ESTIMATED

Line items

Total hours

For comparison, our early notes gave three contradictory CAPEX ranges (EUR 1.2-2.5M, 2.05-3.9M and 2-4M), none with stated assumptions. This tool carries the same uncertainty, with the assumptions in view.