Tool

Mosca calculator

If X + Y > Z, start worrying now (see Mosca's inequality). Here Z is not a single date but a probability range from the Global Risk Institute's expert survey (SOURCED). The six bank data class presets for X are ESTIMATED; adjust them for your institution.

Timeline, 0 to 20 years (GRI survey window shaded)

05101520 yr

Arithmetic